User guide
From installation to an exported drilling program.
1. Getting started
Install the application from the download link in your purchase email (see the installation steps). On first launch it opens an example well marked This is example data; the example wells are fictional. Change any number, or open a saved project, to start your own work.
Every value carries a label: input (you entered it), linked (taken from another page), assumed (a placeholder to replace with well data) or calculated. When data is missing, the result shows N/A and names the input it needs.
2. The screen
- Top bar: active section, design revision, Metric/Oilfield units, Open file, Save file and Print.
- Page menu: grouped as Plan the well, Section design, Drilling fluids, Abandonment, Completion, Execution, Rig, time & cost, Quality control and Program. Press Ctrl+K (Cmd+K on Mac) to search.
- Simple and Detailed: Simple shows the main inputs; advanced inputs fold away but still count in the results. Detailed opens everything.
- Status: OK, Caution, Critical or N/A.
3. Projects and revisions
A project holds one well: its wellbores (including sidetracks), design revisions and hole sections, saved together in one .json file with Save file. The application also autosaves locally, but the .json file is your record.
- A design starts as Draft.
- In Verification & history, enter the originator and reviewer and click Submit for review.
- The reviewer, who must be a different person, clicks Approve or Return to draft.
- An approved revision is locked. Click Create new revision and state the reason for the change to continue.
4. Workflow
Plan the well
- Well path: location, elevation and, offshore, water depth and air gap; then targets or a survey file. Click Use this well path.
- Anti-collision: add offset wells to see the separation factor.
- Hole section: pore pressure and fracture gradient, formation tops and hazards.
- Auto design: compare candidate casing programs and their checks, then click Apply draft.
- Well summary: review the casing program and the status of every module.
- Temperature and Schematic & operations.
Design each section
Choose the active section in the top bar, then work through Casing design, Drill string & BHA, Hydraulics & well control, Offshore & deepwater (offshore wells), Service loads, and if needed Engineering simulations and the Sensitivity laboratory.
Fluids, abandonment and completion
Mud program & rheology, Lost circulation & LCM, Mud checks & inventory, Plug & abandonment and Completion design.
Execution, rig, time and cost
Casing running & cementing (including transient surge), FF calibration, Rig-site calculator, Rig selection and Time & cost. The application supplies no rates or prices; you enter them.
5. Checking the results
- Well summary → Status by section: start from the red cells.
- Design basis & inputs: every input with its source; replace important assumed values.
- Verification & history: regression test, back-test and the audit trail.
- Verification panels in Casing running, Offshore, Service loads and Completion.
6. Exporting the drilling program
- Pick the revision and units in the top bar, then open Drilling program.
- Open Pre-export review and resolve the findings that need it.
- Fill in Document control: document number, issue date, prepared, checked and approved by.
- Under Work sequence & formation evaluation, enter the steps, evaluation plan and hold points for each section.
- Choose the report scope: complete program, executive summary or one section; tick the appendices you need.
- Click Download Word (.docx), Preview & export PDF or Download report HTML.
7. Troubleshooting
- Windows protected your PC: click More info, then Run anyway.
- macOS cannot verify the developer: right-click the app and choose Open, or use Privacy & Security → Open Anyway.
- Inputs cannot be edited: the revision is approved; create a new revision.
- The file is not valid JSON: open a file saved with Save file.
- Still stuck? Email support@drillingworkbench.com with your project file attached.