Verification
Engineers trust a number they can check. These are the checks the software passes in version 29.4.0 A, and how to repeat them.
Summary
| Check | Scope | Result |
|---|---|---|
| Engine regression | 12 reference designs recalculated on every release | 12 of 12 match |
| Independent recalculation | Survey, API rheology, bit and annular losses, SPP, ECD, kill sheet, torque and drag, API collapse and burst ratings, kick tolerance, MAASP, cement volumes, on seven fictional demo wells | 470 pass, 0 fail |
| In-app verification panels | Published worked examples and hand calculations (below) | 21 of 21 pass |
| Interface | All pages and sections at desktop and phone widths; 24 charts | no errors |
In-app checks
Open Casing running, Offshore, Service loads or Completion and expand Verification to rerun these on your computer.
| Area | Check | Reference | Tolerance |
|---|---|---|---|
| Completion | Tubing movement: piston −13.677 in, ballooning −10.424 in, helical buckling −2.125 in, temperature −26.496 in, total −52.72 in | Published worked example, Lubinski method (8,000 ft of 3½ in tubing, 2,000 psi, −40 °F) | 0.2% |
| Completion | Restrained thermal force 21,447 lbf; anchored solution leaves zero movement | Same example; Hooke’s law | 0.2% |
| Casing running | Sudden start, frictionless annulus: pressure step = ρ·a·Δv | Joukowsky relation | 3% |
| Casing running | Slow movement: transient result equals the steady-state model | Limit check | 2% |
| Casing running | Peak surge, two annulus cases | Independent method-of-characteristics program (agrees within 0.5%) | 2% |
| Service loads | Rigid annulus APB = (αf − 2αs)·ΔT / κf; elastic annulus from thick-wall (Lamé) compliance; two coupled annuli | Closed-form hand calculations | 10⁻⁶ |
| Service loads | Wellhead growth δ = Σkδ / Σk; force balance ΣF = 0 | Stiffness method, hand calculation | 10⁻⁹ |
| Offshore | Hydrate temperature from gas gravity; Hammerschmidt inhibitor (MEG, methanol) | Published correlation forms | 0.1% |
What the software does not do
- It is a planning and design aid. Designs still need review and approval by a qualified engineer under your company procedure.
- Transient surge, APB and thermal models are screening models; confirm narrow-window or high-temperature decisions with field data or a dedicated study.
- It ships no rig rates, service prices or offset-well records. You load your own historical data if you want statistics.